Hoag Surgical Theater Operating Rooms – Newport Beach

Hoag Memorial Hospital Presbyterian in Newport Beach is showcasing state-of-the art equipment at its two 820-square-foot operating rooms that DEB Construction recently completed.

The 3D Surgical Theater, which was designed by former Israeli fighter pilots, takes the image of the patient’s brain and recreates a 3D model so neurosurgeons can “fly” through a patient’s brain to get a better look at tumors, nerves, blood vessels and tissue prior to surgery.

Other equipment includes an 84-inch touchscreen system known as the CollaboratOR that displays information from a variety of sources, including X-rays, MRIs and videos from the 3D Surgical Theater. The system permits surgeons, nurses and surgical assistants to simultaneously view, monitor and analyze the information.

Hoag is the only hospital in the nation with the CollaboratOR, according to Dr. Burak Ozgur, a neurosurgeon and chief of service for the neurosurgical spine program, and Dr. Robert Louis, neurosurgeon and program adviser of the skull base and pituitary tumor program. The two spearheaded Hoag’s initiative to bring in these technologies.

Another addition is called the “7D Surgical System” for spinal procedures. The device uses the same technology found in self-driving cars to provide what the doctors say is an unprecedented level of surgical navigation for radiation-free placement of spinal implants.

“This tool still allows the surgeon to be in complete control, but it enhances accuracy and speed during surgery,” Ozgur said.

“When you work with spine, it’s critically important to be precise because the placement of the screws, even off a few millimeters, could damage the spinal cord or hit a nerve,” he said.

A typical brain or spine surgery involves eight to 10 people.

Providence – St. John’s Health Center – Medical Gas Alarm Panel

For this project, the scope involved an installation of new pressure sensors onto live medial oxygen lines and a new digital area alarm panel into a fire rated wall. Additionally, new electrical and low voltage needed to be established for the alarm panel.

At the end of the project the final re-certification of the medical gas lines had to be completed by a hospital preferred vendor, in collaboration with DEB, prior to the entire affected system receiving clearance to go back online.

With the help of our Superintendent and onsite team, we were able to complete the entire scope of work ahead of schedule.

WESCOM Credit Union – Riverside

DEB Construction recently completed a major renovation of the WESCOM branch in Riverside, CA. The almost 3,000 SF facility included new ATM’s, teller counters and financial offices, lobby, and three transaction counters. The reconfiguration included new floor finishes, lighting fixtures and ceilings.  WESCOM’s Sr. Vice president commented “DEB, you guys did great job to stay ahead of the schedule.”

Large American Bank Renovation – Glendale

DEB Construction recently completed renovation of 44,000 SF of two floors in a high rise building for a large American bank’s administrative offices in Glendale.  This project is considered an administration space modernization with new finishes. The project included perimeter private offices, NER/IT rooms, training rooms, conference rooms, break rooms and restroom upgrades along with new office cubicles in the open areas.

WESCOM Credit Union – UCLA Ackerman Hall – Los Angeles

As the “Official Banking Partner” of UCLA Athletics, UCLA Alumni, UCLA Camps Life and Recreation, and the Rose Bowl Stadium, the WESCOM Credit Union mini-branch was built within the existing shell space of the Ackerman Student Union.  The unique design by Little Diversified Architectural Consulting allowed for the full operation and functionality of a traditional branch within a compact 847 square foot space.

Highlights

  • From demolition of existing finishes to completion and turnover, this project was constructed within an occupied food court, with no complaints from students, staff, and campus visitors.
  • The project success was based largely on constant collaboration with Ackerman construction managers, UCLA construction manager and inspectors, and WESCOM construction managers.
  • Identified path of travel, deck scanning and coring to bring HVAC line sets to the 4th floor roof deck

Providence – Pacific Neuroscience Institute – Santa Monica

According to the City of Santa Monica’s architectural description, the three-story building, formerly called the Santa Monica Doctors Building, is a Streamline Moderne medical office building designed in 1946 and constructed during the early 1950s. The building has a distinctive, curved corner entrance located at the southeast corner at the intersection of 22nd Street and Arizona Avenue. The medical office building is the kind of building type that was developed in the early twentieth century as the population in Los Angeles and Santa Monica grew and the medical profession became more specialized.

Many Santa Monica residents have watched the 2125 Arizona Ave. building’s transformation over the years from its original construction between 1950 and 1952 as a medical office building for doctors, dentists and a pharmacy to its latest incarnation; a full core and shell renovation by DEB Construction.

The historic medical building is adjacent to Providence Saint John’s Health Center and within easy access of the hospital’s dedicated neurosurgical operating suites. The completely renovated facility owned by Saint John’s Health Center Foundation, features state-of-the-art equipment and consultation rooms where patients benefit from the highest quality of comprehensive care.

WESCOM Credit Union – Redlands

The WESCOM branch relocation in Redlands, CA offered a unique opportunity for DEB Construction to work within the City limits of Redlands but within the municipal regulations of County of San Bernardino Building & Safety, and San Bernardino County Fire.  DEB’s Superintendent, earned the trust and respect of inspectors by exemplifying our mission statement every day on the job; “To care, collaborate and solve…every project, every partnership, every time.  This 2,033 square foot TI included mechanical, electrical, plumbing systems, and architectural finishes throughout.

Highlights

  • Presented our client with a cost save to bore horizontally underground in lieu of trench and asphalt patching to relocate existing drive-thru ATM power and data to the new tenant space.
  • The branch celebrated their grand opening as originally scheduled.